Framo Engineering awarded LoI from FMC Technologies
Framo Engineering has been awarded a Letter of Intent from FMC Technologies for delivery of a subsea pumping system.
Framo's delivery includes 8 pump modules (each pump @ 2,3 MW), 3 topside Power & Control Modules, tools for installation intervention and testing. Delivery is scheduled for Q3 2009. The pump system will be integrated with the subsea separation system supplied by FMC Technologies to Total's Pazflor Development Project in the block 17 offshore Angola.
|